dc.contributor | Graduate Program in Biomedical Engineering. | |
dc.contributor.advisor | Tanyolaç, Necmi, | |
dc.contributor.advisor | Denker, Ahmet. | |
dc.contributor.author | Göbelek, H. Derya. | |
dc.date.accessioned | 2023-03-16T13:15:06Z | |
dc.date.available | 2023-03-16T13:15:06Z | |
dc.date.issued | 1985. | |
dc.identifier.other | BM 1985 G53 | |
dc.identifier.uri | http://digitalarchive.boun.edu.tr/handle/123456789/19028 | |
dc.description.abstract | The purpose of the Equipment Control Program in Biomedical Engineering is to optimize the safety, effectiveness, efficiency and economy of diagnostic, therapeutic and support equipment used for patient care. In this study, the concept of the Inventory Control, a subprogram of the Equipment Control Program, is investigated. An Inventory tontrol method, to be applied to the Ministry of Health and Social Aid ( S.S.VuB ) hospital, is determined. Finally, this method has been applied to Sisli Etfal Hastahanesi, Istanbul. | |
dc.format.extent | 30 cm. | |
dc.publisher | Thesis (M.S.) - Bogazici University. Institute of Biomedical Engineering, 1985. | |
dc.relation | Includes appendices. | |
dc.relation | Includes appendices. | |
dc.subject.lcsh | Inventory control. | |
dc.subject.lcsh | Medical instruments and apparatus industry -- Inventory control. | |
dc.title | Inventory control in clinical engineering | |
dc.format.pages | 78 leaves; |