Archives and Documentation Center
Digital Archives

Capacity and technology selection via cost modelling in Turkish cement industry

Show simple item record

dc.contributor Graduate Program in Chemical Engineering.
dc.contributor.advisor Arıkol, A. Mahir.
dc.contributor.author Omay, E. Orhan.
dc.date.accessioned 2023-03-16T11:07:57Z
dc.date.available 2023-03-16T11:07:57Z
dc.date.issued 1992.
dc.identifier.other CHE 1992 Om11
dc.identifier.uri http://digitalarchive.boun.edu.tr/handle/123456789/14764
dc.description.abstract Discounted Cash Flow and Net Present Value methods have been used for analyses in Turkish Cement Industry to provide valuable help for prospective investors in crucial aspects such as selecting proper technology, capacity etc.given the relevant data on equipment, raw material and production costs. Both DCF and Net Present Value methods are heavily dependent upon compilation of relevant technological and economical data, hence a through market and literature survey has been conducted to establish a sound data base.Compiled economical data include costs of raw and operating materials, costs of individual equipment items as a function of capacity, past, present and future trends in cement consumption and production both in Turkey and abroad. As for technological information, main technological parameters such as electrical energy consumption per unit production etc, for each available technology and effects of efficient operation on these parameters have been compiled. The compiled information has been evaluated via DCFROI and NPV methods utilizing a software package; Microsoft Works. Sensitivity analyses on important parameters have also been carried out. Results indicate that a capacity of 1500 tons / clinker is the minimum to be employed in a new investment, regardless of the selected processing scheme. As for the proper processing scheme, selection between processes with and is highly dependent on the efficiency of actual plant oparation.
dc.format.extent 30 cm.
dc.publisher Thesis (M.S.) - Bogazici University. Institute for Graduate Studies in Science and Engineering, 1992.
dc.relation Includes appendices.
dc.relation Includes appendices.
dc.subject.lcsh Cement industries -- Turkey.
dc.subject.lcsh Cement industries -- Economic aspects.
dc.title Capacity and technology selection via cost modelling in Turkish cement industry
dc.format.pages xviii, 139 leaves;


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search Digital Archive


Browse

My Account